久久精品国产国产精-中文字幕久久波多野结衣av-精品久久久久久中文字幕无码vr-亚洲国产一区二区三区波多野结衣-最新国产精品久久精品

Technical document

How to solve the problem of shrinkage deformation in injection-molded plastic boxes

2025-08-27 10:48:35 injection-molded

Shrinkage deformation of injection-molded plastic boxes is a key defect affecting product qualification rates. To address it, targeted solutions must be developed based on its root causes.

I. Four Core Causes

Material Differences: Crystalline plastics (PE, PP) have a shrinkage rate of 1.5%-3.0%, while amorphous plastics (PS, PC) only have 0.5%-1.0%. High-shrinkage materials are prone to causing shrinkage. Poor material fluidity leads to "material shortage shrinkage" in thick-walled or complex structures.

Mold Defects: Improper gate size (insufficient material supply for too-small gates, uneven cooling for too-large gates); cooling channel spacing from the cavity deviates from the 10-20mm standard, resulting in uneven cooling rates and inducing shrinkage.

Process Deviations: Excessively high injection temperature prolongs cooling time, while excessively low temperature affects filling; improper injection pressure easily causes material shortage or internal stress; holding pressure < 60% of injection pressure or holding time < 10 seconds fails to compensate for shrinkage.

injection mould

Structural Issues: Large wall thickness differences (thicker walls have significantly higher shrinkage); structures like slender cantilevers and thin ribs are prone to shrinkage due to uneven melt flow or cooling.

II. Targeted Solutions

Material Optimization: Prioritize low-shrinkage materials (e.g., PC/ABS for electronic boxes); add 30% glass fiber to enhance strength, reducing shrinkage rate by 30%-40%. Hygroscopic materials (e.g., PA) need drying at 80-120℃ for 4-6 hours to control moisture ≤ 0.2% and avoid affecting fluidity.

Mold Improvement: Optimize gates via CAE mold flow analysis (multi-point gates for large boxes, appropriately enlarged gates for thin-walled boxes); strictly control cooling channel spacing at 10-20mm, increase pipe density in thick-walled areas, and regularly clean scale to ensure uniform cooling.

Process Adjustment: Set temperatures based on material properties (180-220℃ for PP injection, 40-80℃ mold temperature for crystalline plastics); set holding pressure to 60%-80% of injection pressure, extend holding time to 30 seconds for thick-walled products; cooling time is 20-60 seconds (extended for thick-walled products). Adopt multi-stage injection ("fast filling in early stage, slow holding in later stage") to reduce internal stress.

injection mould

Structural Optimization: Ensure wall thickness difference ≤ 2mm in design, with gradual transition for thick-walled areas; ribs follow the principle of "thickness = 0.5-0.7x main wall thickness, height ≤ 3x main wall thickness, spacing = 2-3x rib height" and match with fillet transitions to reduce stress concentration.

III. Conclusion

Resolving shrinkage deformation requires comprehensive optimization from four dimensions: material, mold, process, and structure. Verifying and adjusting solutions through small-batch trial production can effectively reduce shrinkage rate and improve product quality and production efficiency.

injection mould

Home
Product
News
Contact
主站蜘蛛池模板: 伊人丁香狠狠色综合久久| 熟妇人妻无乱码中文字幕| 国产久青青青青在线观看| 99久久精品美女高潮喷水| 久久99精品久久久久久hb| 欧美日韩精品一区二区视频| 国产自产v一区二区三区c| 99久久免费看少妇高潮a片| 粉嫩高中生无码视频在线观看| 无码专区男人本色| 国产精品亚亚洲欧关中字幕| 精品免费一区二区三区在| 精品久久久无码人妻中文字幕 | 日韩av无码国产精品| 无码精品视频| 日日摸日日碰夜夜爽亚洲| 免费国产a国产片高清| 国产超碰人人做人人爽av动图 | 国产超碰人人做人人爱ⅴa| 特黄aaaaaaaaa毛片免费视频| 亚洲人成伊人成综合网中文| 日韩国精品一区二区a片 | 97人妻碰碰碰久久久久禁片 | 久久天天躁狠狠躁夜夜躁2014| 久久免费99精品国产自在现线| 深夜国产一区二区三区在线看| 亚洲人成日韩中文字幕不卡 | 亚洲精品久久久无码av片软件| 亚洲中文字幕无码天堂男人| 国产精品国产三级区别第一集| 亚洲精品国产福利一区二区| 久久99精品久久久久久秒播 | 精品国偷自产在线视频九色| 国产精品毛片在线完整版| 国产性色αv视频免费| 中字幕视频在线永久在线观看免费 | 理论片午午伦夜理片2021| 无码高潮爽到爆的喷水视频| 精品国产福利在线视频| 成人精品| 7777欧美大白屁股ass|