久久精品国产国产精-中文字幕久久波多野结衣av-精品久久久久久中文字幕无码vr-亚洲国产一区二区三区波多野结衣-最新国产精品久久精品

Technical document

Injection molding process of ABS material

2024-01-07 21:31:37 Injection molding process

ABS (acrylonitrile-butadiene-styrene copolymer) is a common thermoplastic polymer that is widely used in injection molding to produce a variety of plastic parts and products. ABS plastics are known for their good mechanical properties, comprehensive 

stability and ease of processing. Here are some key steps and considerations for the injection molding process of ABS materials:

Equipment selection: Because ABS has good fluidity, it is suitable for using standard injection molding machine for processing. Machine selection should consider the size of the product, wall thickness and injection volume.

Drying: ABS materials must be dried before processing to remove moisture from the material. The general recommended drying conditions are to dry ABS particles in an environment of 80-85°C for 2-4 hours.

injection mould

Melt temperature: The melt temperature range of ABS is usually 210°C to 280°C, and the specific temperature needs to be 

adjusted according to the characteristics of the material and product design. Too high a temperature may cause material 

degradation, while too low a temperature may affect fluidity and product quality.

Mold temperature: The temperature of the mold is usually controlled between 40°C and 80°C to ensure a good product surface finish and reduce internal stress. Mold design and cooling system can also affect this parameter.

Injection pressure: The appropriate injection pressure should be determined according to the design characteristics of the product. In general, the injection pressure of ABS material can range from 50MPa to 100MPa. An inadequate pressure setting may result in inadequate melt filling, while too high a pressure may cause back expansion or warping.

Pressure holding stage: Pressure holding is a stage after injection to ensure that sufficient pressure can be maintained in the cavity to supplement the shrinkage of the melt during the mold cooling and curing process. The setting of the holding time and pressure directly affects the dimensional stability and surface quality of the product.

Cooling time: Sufficient cooling time contributes to full curing and dimensional stability of the product. The length of time depends on a variety of factors, including wall thickness, mold temperature, and product design.

Screw back pressure: Proper screw back pressure can help improve the quality and mixing effect of the melt, while avoiding air mixing. But too high back pressure will increase the wear and energy consumption of the machine.

Stripping and post-treatment: The finished product needs to be removed from the mold, which may require an appropriate stripping mechanism. Some products may also require post-processing steps such as deburring, painting, or coating.

Note that the above parameters may be adjusted according to the specific machine, material, product design and processing environment. Experienced injection molding engineers usually fine-tune according to the actual situation to ensure product quality. When performing ABS injection molding, it is important to follow the specific instructions and data sheets provided by the material supplier, as well as safety procedures and operating guidelines.

injection mould


Home
Product
News
Contact
主站蜘蛛池模板: 国产精品青青草原免费无码| 亚洲日韩在线中文字幕综合| 国产熟妇疯狂4p交在线播放| 国产精品偷伦视频免费观看了| 久久不见久久见免费影院| 亚洲国产第一站精品蜜芽| 国产精品免费看久久久| 国产精品亚洲二区在线看 | 国产精品亚洲专区无码破解版| 亚洲国产成人av网站| 国产高清精品综合在线网址| 亚洲最大天堂无码精品区| 2021精品亚洲中文字幕| 国产高清自产拍av在线| 国产亚洲成av人片在线观看| 免费播放一区二区三区| 一本久道综合在线无码88| 无码人妻一区二区三区免费| 亚洲夜夜性无码国产盗摄| 亚洲日韩中文在线精品第一| 2020亚洲国产精品久久久| 日本肉体xxxx裸交| 久久久久无码精品国产人妻无码| 欧美喷潮久久久xxxxx| 欧洲免费一区二区三区视频| 亚洲午夜成人精品无码| 欧美99久久无码一区人妻a片| 国产一本一道久久香蕉| 亚洲中文字幕无码中文字| 无码人妻精品一区二区三区夜夜嗨| 久久亚洲国产精品亚洲老地址| 久久久精品中文字幕乱码18| 久久精品久久久久观看99水蜜桃| 粗壮挺进邻居人妻无码| 人人澡人人澡人人看添| 国产精品偷窥熟女精品视频| 五月丁香六月综合缴清无码| 日韩av人人夜夜澡人人爽| 中文字幕韩国三级理论| 欧美老妇大p毛茸茸| 亚洲精品日韩中文字幕久久久|